close translate
home > calculators > concrete reclaiming calculator

Concrete Reclaiming Calculator

BIBKO Concrete Reclaimer ROI Calculator

This calculator computes cost savings and potential return on investment for installing a BIBKO 100% concrete recycling system. To get a quick idea of how it works, scroll down and hit the "Calculate" button. For more meaningful results, change the default values to reflect your operation.

Assumptions: 1. Tons per cubic yard = 2
2. Percentage of aggregate per cubic yard = 85%
3. Aggregate is 55% rock and 45% sand
4. Maintenance hours per month = 11.25
5. Cost of site preparation, including concrete work: $150,000
How much concrete do you produce in a year?    cubic yards
What percentage is returned, on average?    percent
How many working days out of 365?    days
What is your delivered cost of rock per ton? $  
What is your delivered cost of sand per ton? $  
What does it cost per ton to remove dried concrete? $  
What is your hourly labor cost for maintenance? $  
What is your cost of electricity per kilowatt hour? $  
 
Usage Model    
Normal BIBKO 1000 (1 to 5 trucks & precast)  
 Heavy Duty BIBKO 2000 (5 to 20 trucks)  
  BIBKO 4000 (18 to 35 trucks)  

Value of recovered sand and rock
Money saved by not having to dispose of returned concrete
Annual net savings (after deducting operating and maintenance costs)
Savings per cubic yard
Payback Period
No-Obligation Plant Evaluation
Thinking of an upgrade? Batches not mixing right? Aging equipment? We'll come to your site and do a thorough analysis, then present a report you can use for planning and implementation.